Suspended Materials

The following materials are currently unavailable for reading and copying.

Material Names Call Marks Periods of Suspension Remarks
Books in the Morrison Collection with Call Numbers beginning with Roman numerals (I, II, III, … etc.) January 14, 2025 – January 2026 (expected) for maintenance
Large Books in the Morrison Collection with Call Numbers beginning with “La”, “Lb”, “Lc”, LFa”, “LFb”, “LFc” January 14, 2025 – January 2026 (expected) for maintenance
大日本国正統図 三-H-d-い-6 June 17, 2021 – to be determined to prepare for exbitions
Asiae nova descriptio E-1-B-2 April 1, 2022 – to be determined to prepare for loan at an external exbition
L’Asie divisée en ses principales regions, et ou se peut voir l’estendüe des empires, monarchies, royaumes, et estats qui partagent présentement l’Asie E-1-B-426 April 1, 2022 – to be determined to prepare for loan at an external exbition
先師孔子行教像 II-16-C-1582 April 1, 2022 – to be determined to prepare for loan at an external exbition
万世師表図 II-16-C-1466 April 1, 2022 – to be determined to prepare for loan at an external exbition
万世師表図 II-16-C-1467 April 1, 2022 – to be determined to prepare for loan at an external exbition
A view of the celebrated Great Wall of China, which divides that Empire from Tartary, & was originally built to prevent the incursions of the Tartars E-1-A-15 April 1, 2022 – to be determined to prepare for loan at an external exbition
Preussische Expedition nach Ost-Asien. Ansichten aus Japan, China und Siam LFc-37 April 1, 2022 – to be determined to prepare for loan at an external exbition
Aquarelle LFc-60 April 1, 2022 – to be determined to prepare for loan at an external exbition
Illustrations of the rockcut temples of India: selected from the best examples of the different series of caves at Ellora, Ajanta, Cuttack, Salsette, Karli, and Mahavellipore LFc-16 April 1, 2022 – to be determined to prepare for loan at an external exbition
Results of a Scientific Mission to India and High Asia undertaken between year 1854 and 1858 … XII-4-2 April 1, 2022 – to be determined to prepare for loan at an external exbition
相承図 VI-4-16 April 1, 2022 – to be determined to prepare for loan at an external exbition
P. Matthaeus Riccius Macerat è Soc. Jesu primo. Chriãnae Fidei in Regno Sinarum propagator : [standing with] Lij Paulus Magnus Sinarum Colaus Legis Christianae propagator E-2-A-26 April 1, 2022 – to be determined to prepare for loan at an external exbition
The reception of the diplomatique & his suite, at the Court of Pekin E-2-B-22 April 1, 2022 – to be determined to prepare for loan at an external exbition
Tchien lung Ta whang tee = Tchien Lung, The great Emperor E-2-A-18a April 1, 2022 – to be determined to prepare for loan at an external exbition
Tchien lung Ta whang tee = Tchien Lung, The great Emperor E-2-A-18b April 1, 2022 – to be determined to prepare for loan at an external exbition
Daniell, William. The European factories at Canton in China : to John Woolmore Esqr … E-1-A-14 April 1, 2022 – to be determined to prepare for loan at an external exbition
南瞻部洲万国掌菓之図 三-H-d-ほ-1 April 1, 2022 – to be determined to prepare for loan at an external exbition
日本島図 E-1-B-15 April 1, 2022 – to be determined to prepare for loan at an external exbition
大日本国正統図 三-H-d-い-6 April 1, 2022 – to be determined to prepare for loan at an external exbition
大日本全圖 三-H-d-い-2(享保5年) April 1, 2022 – to be determined to prepare for loan at an external exbition
蝦夷国全図 XI-5-N-8 April 1, 2022 – to be determined to prepare for loan at an external exbition
Imperii Sinarvm nova descriptio E-1-A-23 April 1, 2022 – to be determined to prepare for loan at an external exbition
Iaponia regnvm E-1-A-49 April 1, 2022 – to be determined to prepare for loan at an external exbition
Route d’Osacca à Ideo; route de Nangasacqui à Osacca par eau E-1-A-50 April 1, 2022 – to be determined to prepare for loan at an external exbition
The Hon. E.I. Co. iron steam ship Nemesis, Lieut. W. H. Hall, R.N. Commander, destroying the Chinese war junks, in Anson’s Bay, Jany. 7th. 1841 E-2-B-5 April 1, 2022 – to be determined to prepare for loan at an external exbition
The Hon. E.I. Co. iron steam ship Nemesis, Lieut. W. H. Hall, R.N. Commander, destroying the Chinese war junks, in Anson’s Bay, Jany. 7th. 1841 E-2-B-6 April 1, 2022 – to be determined to prepare for loan at an external exbition
The Hon. E.I. Co. iron steam ship Nemesis, Lieut. W. H. Hall, R.N. Commander, destroying the Chinese war junks, in Anson’s Bay, Jany. 7th. 1841 新規収蔵 April 1, 2022 – to be determined to prepare for loan at an external exbition
Asia noviter delineata E-1-B-428 April 1, 2022 – to be determined to prepare for loan at an external exbition
British and foreign factories at Canton E-1-A-8 April 1, 2022 – to be determined to prepare for loan at an external exbition
View of Canton E-1-A-29 April 1, 2022 – to be determined to prepare for loan at an external exbition
伊達模樣見立蓬莱 江戸 [安永九] 二卷 合一册 三-F-a-と-ウ-2-18 April 11, 2025 – July 7, 2025 for external exhibition at the Tokyo National Museum
文艺报 (文藝報) IV-28 April 25 & 28, 2025 due to facility construction
大公报 (大公報) V-46 April 25 & 28, 2025 due to facility construction
北京大学日刊 (北京大學日刋) V-53 April 25 & 28, 2025 due to facility construction
南京新报 (南京新報) V-68-(b1) April 25 & 28, 2025 due to facility construction
民国日报 (民國日報) V-68-(b2) April 25 & 28, 2025 due to facility construction
中央日报 (中央日報) V-295 April 25 & 28, 2025 due to facility construction
中央日报 : 国际航空版 (中央日報 : 國際航空版) V-295 April 25 & 28, 2025 due to facility construction
晨钟报 (晨鐘報) V-356-(1) April 25 & 28, 2025 due to facility construction
晨报 (晨報) V-356-(2) April 25 & 28, 2025 due to facility construction
晨报副镌 (晨報副鎸) V-356-(3) April 25 & 28, 2025 due to facility construction
申报 (申報) V-401-(1) April 25 & 28, 2025 due to facility construction
申报自由谈 (申報自由談) V-401-(2) April 25 & 28, 2025 due to facility construction
申报索引 (申報索引) V-401-(3) April 25 & 28, 2025 due to facility construction
解放日报 (解放日報) V-402 April 25 & 28, 2025 due to facility construction
工人日报 (工人日報) V-403 April 25 & 28, 2025 due to facility construction
文汇报 (文匯報) V-404 April 25 & 28, 2025 due to facility construction
新华日报 (新華日報) V-405 April 25 & 28, 2025 due to facility construction
天津日报 (天津日報) V-406 April 25 & 28, 2025 due to facility construction
中国青年报 (中国青年報) V-407-(1)•(2) April 25 & 28, 2025 due to facility construction
南方日报 (南方日報) V-408 April 25 & 28, 2025 due to facility construction
辽宁日报 (遼寧日報) V-409 April 25 & 28, 2025 due to facility construction
北京晚报 (北京晩報) V-410 April 25 & 28, 2025 due to facility construction
大众日报 (大衆日報) V-411 April 25 & 28, 2025 due to facility construction
陕西日报 (陝西日報) V-412 April 25 & 28, 2025 due to facility construction
世界经济导报 (世界經濟導報) V-413 April 25 & 28, 2025 due to facility construction
黑龙江日报 (黑龍江日報) V-414 April 25 & 28, 2025 due to facility construction
北京日报 (北京日報) V-415 April 25 & 28, 2025 due to facility construction
浙江日报 (浙江日報) V-441 April 25 & 28, 2025 due to facility construction
福建日报 (福建日報) V-442 April 25 & 28, 2025 due to facility construction
四川日报 (四川日報) V-443 April 25 & 28, 2025 due to facility construction
湖北日报 (湖北日報) V-444 April 25 & 28, 2025 due to facility construction
广州日报 (廣州日報) V-445 April 25 & 28, 2025 due to facility construction
中国农民报 (中国農民報) V-446-(1) April 25 & 28, 2025 due to facility construction
农民日报 (農民日報) V-446-(2) April 25 & 28, 2025 due to facility construction
沈阳日报 (瀋陽日報) V-447 April 25 & 28, 2025 due to facility construction
澳門日报 (澳門日報) V-449 April 25 & 28, 2025 due to facility construction
工商日报 (工商日報) V-450 April 25 & 28, 2025 due to facility construction
文汇报 : 香港 (文滙報 : 香港) V-451-(a)•(b) April 25 & 28, 2025 due to facility construction
华商报 (華商報) V-473-(a) April 25 & 28, 2025 due to facility construction
云南日报 (雲南日報) CV-494 April 25 & 28, 2025 due to facility construction
吉林日报 (吉林日報) CV-495 April 25 & 28, 2025 due to facility construction
大连日报 (大連日報) CV-496 April 25 & 28, 2025 due to facility construction
盛京时报 (盛京時報) CV-502 April 25 & 28, 2025 due to facility construction
山西日报 (山西日報) CV-516 April 25 & 28, 2025 due to facility construction
新疆日报 (新疆日報) CV-519-(1) April 25 & 28, 2025 due to facility construction
新疆日报 (新疆日報) CV-519-(2) April 25 & 28, 2025 due to facility construction
内蒙古日报 (内蒙古日报) CV-521-(1) April 25 & 28, 2025 due to facility construction
广州民国日报 (廣州民國日報) CV-522-(c1) April 25 & 28, 2025 due to facility construction
甘肃日报 (甘肅日報) CV-532 April 25 & 28, 2025 due to facility construction
宁夏日报 (寧夏日報) CV-533 April 25 & 28, 2025 due to facility construction
羊城晚报 (羊城晚報) CV-534-(a) April 25 & 28, 2025 due to facility construction
羊城晚报 : 新编 (羊城晚報 : 新編) CV-534-(b) April 25 & 28, 2025 due to facility construction
羊城晚报 : 港澳海外版 (羊城晚報 : 港澳海外版) CV-534-(c) April 25 & 28, 2025 due to facility construction
西藏日报 (西藏日報) * June 1956 – December 1962 CV-535 April 25 & 28, 2025 due to facility construction

 

  • *Please note that there may be slight changes to the above materials and periods.